Page 5 - VESBO PPR PRODUCT DATA SHEET
P. 5

Preparation for Fitting & Testing the System                Note:  if  leakage  is  detected,  rectify  the  leakage  area  and  repeat  the
                                                                procedure.  If  pressure  drops  by  more  than  0.2  bar  within  this  period,
    1. For pressure testing, pressure gauges that allow reading of changes in   leakage must have occurred. Detect, rectify and repeat procedure.
    pressure of 0.1 bar shall be used, fitted at the lowest possible point in the
    system.                                                     Step 4
                                                                Pressure  test  is  successful  when  all  the  above  are  met  and  readings
    2. Pressure testing for leakages must be conducted while pipe works are   recorded.
    still accessible and before concealing or plastering.
                                                                2.14 Installation Tip and Techniques
    3.  Finished  pipe  work  must  be  completely  fitted  with  filtered  water  and
    vented.                                                     1. To reduce the diameter of a pipeline, i.e., joining a larger pipe to a smaller
                                                                one, a socket must be used in conjunction with a reducer. For example, to
    Test Procedure                                              reduce a pipe diameter from 50 mm to 25 mm, a 50 mm socket must first
                                                                be attached to the 50 mm pipe, followed by a 50/25 mm reducer and finally
    After the pipe work is filled with water and completely vented to release air   the 25 mm pipe.
    locks in the system, testing may begin:

                                                                2.  When  using  VESBO  fittings  with  metal  threaded  parts,  white  Teflon
                                                                sealing tapes must be applied adequately to prevent leakage from threads.

                                                                3. Over-tightening of fixtures to VESBO fittings with metal parts may cause
                                                                damages  and  leakage  problems.  Care  must  be  taken  to  prevent  over-
                                                                tightening.

                                                                4. During fusion welding:
                                                                • Fusion parts must be free from sand and particles.
                                                                • Welding time and depths must be observed.
                                                                •Do not twist and turn pipes and fittings while inserting and detaching from
                                                                welding machine.

                                                                5. Metal plugs must be used during pressure tests.
    Step 1
    Produce  the  test  pressure  (=permissible  working  pressure  +5  bar),  two   6. Pressure test must be conducted BEFORE concealing pipe works.
    times within 30 minutes at 10 minute intervals.
                                                                7. Install VESBO pipes and fittings according to pressure, temperature and
    Note: If there is a pressure drop, restore by hand pump to the required test   expansion limitations indicated in VESBO's Technical Catalogue.
    pressure  after  the  10  minute-interval.  If  leakage  is  detected,  rectify  the   8. Do not use pipes that are damaged or cracked at interfaces. Use only
    leakage area and repeat the procedure.                      special pipe cutters to shorten pipes.

    Step 2                                                      9. If painting of the installation is required after welding, insulate the VESBO
    If no leakage is detected, for the next 30 minutes check if the pressure has   pipeline to prevent the passage of chemicals in the paint, which will cause
    dropped by more than 0.6 bar and if there are any visible signs of leakage.   water contamination through the pipe wall or affect the service life of the
                                                                installation.  VESBO  does  not  warrant  any  responsibility  regarding
    Note:  if  leakage  is  detected,  rectify  the  leakage  area  and  repeat  the   exposures to chemicals and paints. Customers are strictly recommended
    procedure.  If  pressure  drops  by  more  than  0.6  bar  within  this  period,   to consult our technical department before the design stage of a project.
    leakage must have occurred. Detect and rectify.

                                                                10. Use only fittings with parallel threads, do not use conical threads and
    Step 3                                                      do not tighten too firmly.
    If pressure drop is within 0.6 bar and no leakage is detected, continue the
    test without restoring the required pressure for the next 120 minutes. During   11. Insulate VESBO exterior installations to prevent excessive heat loss
    this time, check if the pressure drop is more than 0.2 bar and no leakage is   and to protect against UV radiation.
    detected.
                                                                12. Before welding commences, it is recommended to cut pipe ends by 4 -
                                                                5 cm. Temperatures of welding adaptors should be high enough for welding
                                                                process, i.e., 250 - 260°C.